Railcar Loading Racks
Multiple Car/ Hatch
Special Platform Applications
Distribution Design
|
Example of supported boom loading arm for railcar with engineered loading arm support by SafeRack. Note steel and design requirement for properly supporting big loading arms. Not properly supporting loading arms will cause them to drift away from the railcar and not function easily.
|
SafeRack for Hopper car fit inside existing building. Trolley beam fall protection was included in scope of work as well as turn key installation services. WIth this system, the operator can walk the length of the hopper car to access and open multiple hatches and maintain fall protection requirements.
|
Dry Bulk Hopper Car System- Existing building did not have enough room to allow SafeRack system to be added inside. Design (due to space constraints) included the installation of a SafeRack access platform and gangway outside the building. For fall protection, a trolley beam solution was chosen due to multipe hatchs on hopper cars needing to be accessed. The trolley beam was extended outside the building so that the operator could hook up prior to access of the vehicle. The operator can walk inside the building on top of the hopper car to access hatches.
|
Turn Key Platform System being installed. SafeRack can provide design help, installation, piping, and all necessary components you require for your loading area.
|
This project shown during installation shows two new rail spurs for railcar distribution. Access platform, gangways with fall protection safety cages, loading arm pipe spools, pipe supports, loading arms, operator shelter, and field supervision were all part of this project. SafeRack will work with you to put value added designs together for your project.
|
This project included platforms, gangways, pipe racks and pipe supports. Design allowed for continued growth of additional spots as well as varying lengths of railcars that might need to be loaded in the future.
|
Multiple SafeRack systems with optional rear access stair unit on each one. Standard SafeRack Stair units run parallel with Railroad Tracks. This system set up works well with uncoupled railcars or railcars with predictable lengths. For high volume loading racks, a single platform running the length of the railcars is encouraged because mis-spotting can be designed into the platform along with the reduction of travel up and down stairs.
|
Turn Key Platform Systems available with loading arm designs, piping and installation.
|
This Railcar spot includes a track mounted gangway to access the railcar hatch with a greater amount of miss-spotting capability.
|
Call us today, toll free, at 866-761-7225 to see how we can help you with your bulk chemical loading or
send us an email at info@saferack.com.