Due to the challenges of loading acid, Eco-Services requested fiberglass walk surfaces on both the platform and gangways that SafeRack was providing as well as rise over run stairs and pipe handrails. But not to worry, SafeRack was up to the challenge of satisfying the customer. The challenge was integrating their existing perpendicular pipe racks to SafeRack’s long canopy platform system without disrupting their product pipe header and shutting the loading process down for an extended period of time.
SafeRack slowly dismantled their existing platforms with careful precision taking into consideration that Eco-Services had three overhead perpendicular pipe racks that were feeding the acid railcars.
Due to the challenges of loading acid, Eco-Services requested fiberglass walk surfaces on both the platform and gangways that SafeRack was providing as well as rise over run stairs and pipe handrails. But not to worry, SafeRack was up to the challenge of satisfying the customer. The challenge was integrating their existing perpendicular pipe racks to SafeRack’s long canopy platform system without disrupting their product pipe header and shutting the loading process down for an extended period of time.