IFCo Nitrogen Fertilizer railcar bulk loading project

Nitrogen Fertilizer Bulk Railcar Loading Project – IFCo

Location
Wever, Iowa United States
Project
Bulk Loading Platform
Product
 SafeRack gangways, loading arms, pipe racks, fall protection systems, drench showers, platform canopy
Client
Iowa Fertilizer Company (IFCo)
Materials/Product
Nitrogen Fertilizers
Diesel Exhaust Fluid

SafeRack Bulk loading platform installation for IFCo in Iowa. Fractionation Loading Terminal.

When the installation was completed, the Iowa plant was expected to produce at least 1.5-2 million metric tons of nitrogen fertilizers and diesel exhaust fluid each year. With Iowa’s harsh winters, the installation was on a critically tight turnaround schedule. Additionally, the platform needed a canopy to protect workers in the winter and the platform and equipment had to withstand the corrosive and abrasive environment.

IFCo piperack and loading platform during construction